How is Building Reinforcement Done?

How is Building Reinforcement Done?

by Ayşe Öztürk - April 14, 2025

In the initial phase of structural reinforcement, the current condition of the building is determined through core testing, rebar detection, and soil analysis. Based on the results, the building is strengthened using techniques such as reinforced concrete jacketing, steel bracing or carbon fiber wrapping.

Why is Building Reinforcement Necessary?

Structural reinforcement is an engineering application to enhance the durability of existing buildings against earthquakes and other natural disasters. Especially buildings constructed before 1999 may not meet current earthquake regulations, making reinforcement essential.

How Long Does Building Reinforcement Take?

The duration of reinforcement varies based on the building’s size, number of floors, and level of damage, but it generally takes between 2 to 6 months on average.

Do Residents Need to Vacate During Reinforcement?

In most cases, residents may need to vacate their homes due to extensive interior works. However, the process can also be managed with floor-by-floor or zone-based evacuation plans.

Are Reinforced Buildings Structurally Sound?

Reinforcement procedures bring the structure in line with current building regulations. Especially when reinforced with steel and carbon fiber systems, the structural integrity reaches maximum safety levels.

What Should Be Done to Reinforce Columns?

Before reinforcement, the performance of the columns is tested. Then, suitable techniques such as carbon fiber wrapping, steel casing, or concrete jacketing are applied.

How Are Columns Reinforced?

Primary methods of column reinforcement include:

How Long Does Column Reinforcement Take?

The application time for a single column typically ranges from 1 to 2 days. For floor-by-floor reinforcements, the total duration may extend to several weeks.

What Are the Column Reinforcement Costs in 2025?

Prices are calculated per square meter. Depending on the materials and methods used, the cost per column may vary significantly.

Which Buildings Are Eligible for Reinforcement?

Reinforcement vs. Reconstruction: Which is Better?

Demolition and reconstruction are time-consuming, costly, and require complex permits. Reinforcement, on the other hand, is more cost-effective and faster. Yükselen Mimari offers professional assessments to recommend the best solution.

How is a Building Reinforcement Project Prepared?

The process begins with a structural report, soil study, and performance analysis of the current building. Engineers then design the reinforcement project, which must be approved by the local municipality.

Legal Regulations for Reinforcement Practices

Reinforcement must be carried out in accordance with zoning laws and based on an approved municipal project. Any unlicensed work is considered illegal. Additionally, the consent of the building residents is required under the Condominium Law.

Building Reinforcement Costs in 2025

As of 2025, reinforcement costs vary per square meter. Prices may increase depending on the selected materials and methods. Government-supported credit options are available for financing.

Why Choose Yükselen Mimari for Reinforcement?

Yükselen Mimari, known for its modern housing projects in Antalya and expert technical staff, also offers services in structural reinforcement. From core sampling and soil analysis to structural assessments and project approvals, we provide end-to-end consultancy. Explore our projects and contact us for detailed information and safe solutions tailored to your building.